• contact  |  phone: +49 (0)6707 6668-0
  • 24h service hotline: +49 (0)6707 6668-1211
    • Deutsch
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic [new]
        • WT 200 e.tronic
        • WT 260 e.tronic [new]
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 420 e.tronic
        • WT 560 e.tronic [new]
        • WT 650 e.tronic
        • WT 720 e.tronic [new]
      • Luffing Jib Cranes
        • WT 205L e.tronic
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic [new]
        • WT 200 e.tronic
        • WT 260 e.tronic [new]
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 420 e.tronic
        • WT 560 e.tronic [new]
        • WT 650 e.tronic
        • WT 720 e.tronic [new]
      • Luffing Jib Cranes
        • WT 205L e.tronic
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
  • Home
  • all reference projects
  • Pont du Lanciau, Rossinière

Pont du Lanciau, Rossinière (CH)
Bridge and Tunnel

Crane rental/service Kaufmann Turmkrane AG
Customer
Consortium Pont du Lanciau
Construction from 11/2017 up until ca. 09/2018
Picture of the tandem lift
Tandem lift of the old steel construction together with an specially supported mobile crane
Picture of the mounting of the cross frame
Mounting of the cross frame on the lead-out of the adjacent dam's support wall
Picture of a truck delivering one of the tower elements on a narrow mountain road
Delivery of the tower elements
Picture of the jib assembly
The jib is lifted for assembly
Picture of the tower assembly
Assembly of the tower on top of the cross frame
Picture of the snow-covered jib of the WT 650 e.tronic and the barrier lake
Picture of the snow-covered counter-jib and the valley
Picture of the lead-out of the dam’s support wall and the crane base
View of the lead-out of the dam’s support wall and the crane base
Picture of the positioning of the first new bridge elements
The first new bridge elements are put in position
Picture of the delivery of a new bridge element
A new brigde element is lifted from the lorry
Picture of the construction of the new bridge
Construction of the new bridge
Picture of the lift of a bridge segment
One more bridge segment is lifted to its place
Picture of the old bridge of Lanciau
The old bridge

WT 650 e.tronic

Hook height 56.0 m
Radius 45.0 m
Foundation Cross 8.0×8.0 m
Special feature
- Crane foundation on the lead-out of the adjacent dam’s support wall
- Tandem lift with mobile crane
The Bridge
The Swiss railway line between Montreux and Lenk in Simmental is now over 100 years old. The oldest section between Montreux and Les Avants was already opened in 1901 and even the youngest between Zweisimmen and Lenk in Simmental has been in use since 1912. Operated by the Montreux Bernese Oberland Bahn, this single track narrow meter gauge line overcomes a difference of altitude of more than 850 m. 

This mountainous terrain requires several tunnels and bridges as well as an avalanche protection gallery. Since these constructions are very old, the desired structural safety is no longer given which is why they are currently under renovation or being rebuilt in accordance with the applicable standards. This includes the bridge Lanciau at Rossinière.

The Task
At the Pont du Lanceau, the old bridge construction must be completely replaced by a new steel construction. To do this the existing bridge pillars must also be refurbished. The framework conditions are demanding; due to the cramped, hilly terrain, not only the delivery of the crane but also the assembly is extremely difficult. Furthermore, the old steel structure should be removed in one piece in a tandem lift with a mobile crane.

Our Partner Kaufmann took on the overall planning and implementation, including delivery, crane assembly and tandem lift, in cooperation with the customer.

The Implementation
Our WT 650 e.tronic was mounted with an 8.0 m cross frame on the lead-out of the adjacent dam’s support wall.
Rails, sleepers, ballast and high cable channels were removed and the foundations of the high-line poles taken away. For the tandem lift of the steel construction, the necessary mobile crane had to be secured with a special support. Currently, the new steel structure is being built and mounted and the existing bridge pillars have been refurbished. Subsequently new cable trays must be installed, the appropriate cable laid and the foundations of the catenary masts will be renewed.
Hard load test for the crane base
At the beginning of 2018 there were storms with extreme rainfall, which led to dramatic amounts of water in the chutes. But it didn’t have any effect on the crane:
http://www.wilbert.de/wp-content/uploads/VID-20180104-WA0016_Pont_du_Lanciau.mp4
The tandem lift per UAV
Further Information
- on the railway line and its history (German only)
- Video on the construction of the steel structure by SottasSA
WILBERT Project References
  • All
  • all reference projects
  • cooling towers
  • power plants
  • structural engineering
Picture of the new cooling tower in Sostanj with the adjacent cooling tower and our WT 300 e.tronic

Šoštanj, Slowenia

The thermal power plant Šoštanj was ecologically optimized by the construction of a new block with the newest technology that planned to replace the others step by step. The corresponding cooling tower was errected by a WT 300 e.tronic in our special version.
Großbaustelle am Kraftwerk Datteln mit unserem WT 300 e.tronic Spezialausführung K

Datteln 4, Nordrhein-Westfalen, Germany

At the new power plant unit Datteln 4, one of our WT 300 e.tronic special type cooling tower including a self-dismantling jib was working on a 178 m high natural draft cooling tower.
WT 205L working on natural draft cooling tower in Lingen

Natural draft cooling tower at gas power station Emsland

The natural gas power station Emsland consists of three active units. A natural draft cooling tower that was built by a WT 205L is part of the newest one.
WILBERT Kran auf dem Dach des Deutsche Bank Hochhaus

Deutsche Bank, Frankfurt

The WT 200 e.tronic was used to replace the suspended aluminium and glass façade. It was mounted to the roof of one of the twin towers with a specially made steel structure.
  • 1
  • 2







  • Follow us

  • Contact

    WILBERT TowerCranes GmbH
    Lohrgraben 2
    55444 Waldlaubersheim
    GERMANY

    +49 (0)6707 6668-0
    info@wilbert.de

    Legal notice | Data privacy

  • Sprache wechseln zu

    • Deutsch
  • Top Topics

    • About WILBERT
    • Contact
    • Products
    • Project references
    • Crane service
    • Planning for crane projects
    • Rent a crane
  •  
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkRead more