• contact  |  phone: +49 (0)6707 6668-0
  • 24h service hotline: +49 (0)6707 6668-1211
    • Deutsch
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic [new]
        • WT 200 e.tronic
        • WT 260 e.tronic [new]
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 420 e.tronic
        • WT 560 e.tronic [new]
        • WT 650 e.tronic
        • WT 720 e.tronic [new]
      • Luffing Jib Cranes
        • WT 205L e.tronic
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic [new]
        • WT 200 e.tronic
        • WT 260 e.tronic [new]
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 420 e.tronic
        • WT 560 e.tronic [new]
        • WT 650 e.tronic
        • WT 720 e.tronic [new]
      • Luffing Jib Cranes
        • WT 205L e.tronic
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
  • Home
  • all reference projects
  • Specialised Crane at Grand Tower, Frankfurt

Specialised Crane at Grand Tower, Frankfurt
Structural Engineering

Customer
gsp Städtebau GmbH
Crane use
04/2019 till 02/2020
Specialised crane for the facade mounted on the roof of Grand Tower
Screenshot of the building site webcam (see „more info“)

Specialised Crane

Tower heigth 6.9 m
Max. hook path 190 m
Radius
35 m
Base
4×4 m cross frame with special-built substructure
Special features - mounted on the roof of the tower
- special hoisting winch 
- tailor-made hoisting load adjustment
- dismountable in small pieces
The Grand Tower 
With a gross floor area of 40.000 m² and a height of 172 m, Grand Tower in Frankfurt is the highest residential tower in Germany. Just a few of the over 400 penthouses and apartments with 41 to 300 m² and concierge service are still for sale. The architecture of Magnus Kaminiarz & Cie with curved balconies or loggias and full panorama windows is airy and modern. Already, the building has reached its full height and it is scheduled to be completed within 2019. At the moment, the focus of the work is on the facade and on the balconies/loggias.
The task
Two WT 420 e.tronic were responsible for the construction of Grand Tower. One of them was already dismantled in December 2018. The other WT 420 e.tronic now has to mount a specialised crane on the roof of the building that is going to be used for the facade and the construction of the balconies/loggias.
The implementation
In order to assemble the specialised crane on the roof at 176 m, the WT 420 e.tronic had to be climbed to 197 m first. The 4×4 m cross frame for the crane was placed on a custom-designed substructure. Likewise, the hoisting winch was special-built and the hoisting load adjustment was tailor-made for this application. The planned tasks required a load torque of 150 mt and 35 m radius. 

The activities of the specialised crane can be watched via the Grand Tower building site web cam.
The finale
When the work of the specialised crane was done in February 2020, its last task was to bring up a WT 35L montage crane that then dismantled the WT 150 e.tronic.  As this was planned beforehand, it was prepared at the factory in such a way, that it could be disassembled in especially small pieces.
Grand Tower WT 150 e.tronic disassembly | Demontage

A short video of the disassembly of our specialised WT 150 e.tronic on Grand Tower | Ein kurzes Video von der Demontage unseres WT 150 e.tronic Spezialkrans am Grand Tower.Mehr darüber in diesem Post | More about this over here: https://www.facebook.com/2138625706360966/posts/2691537774403087/?d=n

Gepostet von Wilbert TowerCranes GmbH am Samstag, 22. Februar 2020
More info
- Website of the building project
- The appartments in Grand Tower
- Grand Tower building site web cam
WILBERT Project References
  • All
  • all reference projects
  • cooling towers
  • power plants
  • structural engineering
Picture of the new cooling tower in Sostanj with the adjacent cooling tower and our WT 300 e.tronic

Šoštanj, Slowenia

The thermal power plant Šoštanj was ecologically optimized by the construction of a new block with the newest technology that planned to replace the others step by step. The corresponding cooling tower was errected by a WT 300 e.tronic in our special version.
Großbaustelle am Kraftwerk Datteln mit unserem WT 300 e.tronic Spezialausführung K

Datteln 4, Nordrhein-Westfalen, Germany

At the new power plant unit Datteln 4, one of our WT 300 e.tronic special type cooling tower including a self-dismantling jib was working on a 178 m high natural draft cooling tower.
WT 205L working on natural draft cooling tower in Lingen

Natural draft cooling tower at gas power station Emsland

The natural gas power station Emsland consists of three active units. A natural draft cooling tower that was built by a WT 205L is part of the newest one.
WILBERT Kran auf dem Dach des Deutsche Bank Hochhaus

Deutsche Bank, Frankfurt

The WT 200 e.tronic was used to replace the suspended aluminium and glass façade. It was mounted to the roof of one of the twin towers with a specially made steel structure.
  • 1
  • 2







  • Follow us

  • Contact

    WILBERT TowerCranes GmbH
    Lohrgraben 2
    55444 Waldlaubersheim
    GERMANY

    +49 (0)6707 6668-0
    info@wilbert.de

    Legal notice | Data privacy

  • Sprache wechseln zu

    • Deutsch
  • Top Topics

    • About WILBERT
    • Contact
    • Products
    • Project references
    • Crane service
    • Planning for crane projects
    • Rent a crane
  •  
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkRead more