• contact  |  phone: +49 (0)6707 6668-0
  • 24h service hotline: +49 (0)6707 6668-1211
    • Deutsch
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
      • General Rental Terms and Conditions
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic
        • WT 200 e.tronic
        • WT 260 e.tronic
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 360 e.tronic
        • WT 420 e.tronic
        • WT 440 e.tronic
        • WT 650 e.tronic
        • WT 720 e.tronic
      • Luffing Jib Cranes
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
      • General Rental Terms and Conditions
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic
        • WT 200 e.tronic
        • WT 260 e.tronic
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 360 e.tronic
        • WT 420 e.tronic
        • WT 440 e.tronic
        • WT 650 e.tronic
        • WT 720 e.tronic
      • Luffing Jib Cranes
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
  • Home
  • news
  • WT 650 e.tronic in Industrial park Höchst–impressive freestanding hook height

WT 650 e.tronic in Industrial park Höchst–impressive freestanding hook height

2022/12/14
A Wilbert WT 650 e.tronic crane was in use over a period of 18 months during the construction of the new gas turbine system for Infraserv GmbH & Co. Höchst KG. The detailed application concept was developed and implemented together with the general contractor Standardkessel Baumgarte GmbH.

The modular design and combination of reinforced tower elements E33V (system dimensions 5.00 x 3.33 x 3.25 meters) and subsequently T100 (system dimensions 6.45 x 2.12 x 2.12 meters) have the enormous free-standing hook height of 107.60 meters.

Due to the space available at the site, both the assembly and disassembly of the WT 650 e.tronic was carried out using a 500-ton special mobile crane with a main boom (57.7 to 68.2 meters) and luffing jib (63.0 to 84.0 meters).

With a radius of 50 meters, the WT 650 e.tronic was able to effortlessly cover the entire working area. The maximum lifting capacity is 32 tons and at the tip of the boom 13.6 tons.
First, the stair towers were erected using the 24-hour slipforming method. This seamless concreting was completed in nine working days thanks to the high working speeds of the crane.

The crane also erected the entire steel structure of the boiler house and lifted in pipes, ducts and other components. Facade elements and trapezoidal sheets were also delivered by the crane and two chimneys including bypass chimneys were erected using man baskets.

Sources / further information:
https://www.infraserv.com/de/unternehmen/nachhaltigkeit/gasturbinen/

https://www.standardkessel-baumgarte.com/referenzen/gud-anlage-hoechst-frankfurt

 https://www.youtube.com/watch?v=OTclTDS8rD8


  • Contact

    ZOOMLION Germany GmbH
    Lohrgraben 2
    55444 Waldlaubersheim
    GERMANY

    +49 (0)6707 6668-0
    info@zoomlion-germany.com

    Legal notice | Data privacy

  • Sprache wechseln zu

    • Deutsch
  • Top Topics

    • About WILBERT
    • Contact
    • Products
    • Project references
    • Crane service
    • Planning for crane projects
    • Rent a crane
  • General Terms and Conditions

    • Purchase
    • General Delivery
    • Rental Terms & Conditions
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.