Thanks to the carefully designed tower system our cranes can be used with few or even completely without stays in structural engineering projects.
- Home
- Project References
- Structural Engineering
Structural Engineering
Project references
Specialised Crane at Grand Tower, Frankfurt
At Grand Tower in Frankfurt, the facade and the balconies/loggias are attached currently. This task was taken on by a WILBERT specialised crane mounted on the roof of the building.
JaBee Tower, Dübendorf (CH)
The highest residential tower in Switzerland is being built in Dübendorf near Zurich. Five commercial premises on the ground floor and 218 rental apartments are distributed over a tower height of 100 m. Due to the proximity to the airport, the crane was dismantled at night after the suspension of flight operations.
Grand Tower, Frankfurt
There's a webcam where you can live view the construction of Germany's tallest residential tower and our two WT 420 e.tronic on site.
Marienturm, Frankfurt
The construction progress of the Marienturm, a new office tower in Frankfurt's banking district, can be viewed live via webcam. Two WT 335L e.tronic cranes from our rental fleet are involved in this project.
OpernTurm, Frankfurt
The 170m skyscraper was completed in spring 2016 and comprises an impressive 62,500 m² of usable space on 42 storeys. During the construction phase, two WT 300 e.tronics and one WT 205L e.tronic were used.
Alpha Rotex in Gateway Gardens, Frankfurt
At 66 m and 16 storeys, Alpha Rotex is the tallest building right at the airport. A WT 300 e.tronic, a WT 200 e.tronic and a WT 180 were involved. A height limit had to be observed due to the building’s proximity to the airport.
Deutsche Bank, Frankfurt
The WT 200 e.tronic was used to replace the suspended aluminium and glass façade. It was mounted to the roof of one of the twin towers with a specially made steel structure.