• contact  |  phone: +49 (0)6707 6668-0
  • 24h service hotline: +49 (0)6707 6668-1211
    • Deutsch
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
      • General Rental Terms and Conditions
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic
        • WT 200 e.tronic
        • WT 260 e.tronic
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 360 e.tronic
        • WT 420 e.tronic
        • WT 440 e.tronic
        • WT 650 e.tronic
        • WT 720 e.tronic
      • Luffing Jib Cranes
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
      • General Rental Terms and Conditions
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic
        • WT 200 e.tronic
        • WT 260 e.tronic
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 360 e.tronic
        • WT 420 e.tronic
        • WT 440 e.tronic
        • WT 650 e.tronic
        • WT 720 e.tronic
      • Luffing Jib Cranes
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
  • Home
  • all reference projects
  • Grand Tower, Frankfurt

Grand Tower, Frankfurt
Structural engineering

Customer Karl Gemünden GmbH & Co.
Crane assembly
09/2016 and 11/2016
Picture of the construction progress on the Grand Tower with two WT 420 e.tronic
Picture of the first few floors of the Grand Tower in Frankfurt with two WT 420 e.tronic
Picture of the Grand Tower and two 420 e.tronic the construction work thereof you can watch on webcam
The building
In Europa-Allee 2, Germany's tallest residential tower with a target height of 172 m providing exclusive living space between the banking district, Westend and Europaviertel is being built.

The Grand Tower will house 401 apartments and penthouses from 41 to 300 m² and a 1000 m² large rooftop garden.

The implementation
Two WT 420 e.tronic cranes grow with the building up to a final height of 190 and 203 m. At the current height, one active stay secures each tower, one at 86 m and the other at 84 m. The new tower system allows for significantly higher tower heights with the same number of guying fixtures.

View webcam Grand Tower

WT 420 e.tronic

Hook height current: 171.0 m
final: 203.0 m
Radius 40 m
Foundation Foundation anchor
Special feature new tower system T 100
stay at 86.0 m

WT 420 e.tronic

Hook height current: 131.0 m
final: 190.0 m
Radius 40 m
Foundation Foundation anchor
Special feature
standard tower system S20
stay at 84.0 m
WILBERT Project References
  • All
  • all reference projects
  • large construction sites
  • special projects
  • structural engineering
  • bridges and tunnels
  • power plants
WT 260 e.tronic at the replacement of a central bridge in Magdeburg

Replacement Bridge Strombrückenzug, Magdeburg (DE)

Our allrounder crane WT 260 e.tronic works at the central pylon of the bridge that is going to cross the Zollelbe and the Alte Elbe in Magdeburg. With its fast work speeds it is ensuring that everything works smoothly on the builiding site.
Vier WT 650 e.tronic Laufkatzkrane vor blauem Himmel

Police Headquarters Osthessen, Offenbach (DE)

A new era is dawning for the police in Osthessen. Five WT 650 e.tronic are needed to span the major construction site of the new headquarters that will house 11 departments and 900 officers.

Expansion of Utrecht University

On the grounds of Utrecht University, two WT 335L e.tronic and a WT 555L e.tronic are working on an 18 storey building specially designed to be low vibration.

Specialised Crane at Grand Tower, Frankfurt

At Grand Tower in Frankfurt, the facade and the balconies/loggias are attached currently. This task was taken on by a WILBERT specialised crane mounted on the roof of the building.

JaBee Tower, Dübendorf (CH)

The highest residential tower in Switzerland is being built in Dübendorf near Zurich. Five commercial premises on the ground floor and 218 rental apartments are distributed over a tower height of 100 m. Due to the proximity to the airport, the crane was dismantled at night after the suspension of flight operations.
Picture of our WT 420 e.tronic during the deconstruction of Deutsche Bank IBCF in Frankfurt

Deconstruction of Deutsche Bank IBCF, Frankfurt

On the former Deutsche Bank site, the old buildings had to make room for a building complex of four high-rise towers, the Quartier Four, that is planned to be completed in 2023.
Picture of the lift of a bridge segment

Pont du Lanciau, Rossinière

Reconstruction of the Pont du Lanciau: demanding work due to the cramped, hilly terrain and a tandem lift with a mobile crane.
Picture of Marienturm with the twin towers of Deutsche Bank in the background

Marienturm, Frankfurt

The construction progress of the Marienturm, a new office tower in Frankfurt's banking district, can be viewed live via webcam. Two WT 335L e.tronic cranes from our rental fleet are involved in this project.

Solar Tower Ouarzazate, Morocco

The steel components of the absorber have a maximum weight of 90 t and were lifted to the top of the 240 m solar tower by our WT 2405L e.tronic.
WILBERT Laufkatzkrane auf der Baustelle des HRW-Campus

Ruhr West University of Applied Sciences, Mülheim

HWR’s new campus was built on an area of approx. 40,000 m² between September 2012 and December 2015. Four WILBERT trolley cranes were used: 3× WT 200 e.tronic and 1× WT 320 e.tronic.

REA Turow, Bogatynia (PL)

Here, the task of the WT 2405L e.tronic was the chimney modernisation in a densely built-up area: The existing filters had to be replaced by new, better performing filters at dizzying heights. The crane was assembled at a low height and then erected by crawling for this purpose.
Zwei WT 200 e.tronic und WT 150 e.tronic an der Wohnanlage Feuerbachtraße

Housing Development Feuerbachstraße, Frankfurt

A residential complex comprising 126 luxury apartments and an underground garage with 220 parking spaces was built in Feuerbachstraße in Frankfurt. Construction was completed in 2015. Four WILBERT cranes were used: 2× WT 150 e.tronics and 2× WT 200 e.tronics.
Mehrere WILBERT Krane an der neuen OpernTurm Baustelle

OpernTurm, Frankfurt

The 170m skyscraper was completed in spring 2016 and comprises an impressive 62,500 m² of usable space on 42 storeys. During the construction phase, two WT 300 e.tronics and one WT 205L e.tronic were used.
Getreidesilo im Hafen von Brake

Grain Storage Silos, Brake

38 honeycomb-shaped silos in total measuring 61 m in length, 22 m in width and 83 m in height were erected in the port of Brake, Germany, by a WT 200 e.tronic and a WT 300 e.tronic using the slip-form method.
Mehrere WILBERT Krane am Alpha Rotex im Frankfurter Gateway Garden

Alpha Rotex in Gateway Gardens, Frankfurt

At 66 m and 16 storeys, Alpha Rotex is the tallest building right at the airport. A WT 300 e.tronic, a WT 200 e.tronic and a WT 180 were involved. A height limit had to be observed due to the building’s proximity to the airport.
  • 1
  • 2


  • Contact

    WILBERT TowerCranes GmbH
    Lohrgraben 2
    55444 Waldlaubersheim
    GERMANY

    +49 (0)6707 6668-0
    info@wilbert.de

    Legal notice | Data privacy

  • Sprache wechseln zu

    • Deutsch
  • Top Topics

    • About WILBERT
    • Contact
    • Products
    • Project references
    • Crane service
    • Planning for crane projects
    • Rent a crane
  • General Terms and Conditions

    • Purchase
    • General Delivery
    • Rental Terms & Conditions