• contact  |  phone: +49 (0)6707 6668-0
  • 24h service hotline: +49 (0)6707 6668-1211
    • Deutsch
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
      • General Rental Terms and Conditions
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic
        • WT 200 e.tronic
        • WT 260 e.tronic
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 360 e.tronic
        • WT 420 e.tronic
        • WT 440 e.tronic
        • WT 650 e.tronic
        • WT 720 e.tronic
      • Luffing Jib Cranes
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
      • General Rental Terms and Conditions
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic
        • WT 200 e.tronic
        • WT 260 e.tronic
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 360 e.tronic
        • WT 420 e.tronic
        • WT 440 e.tronic
        • WT 650 e.tronic
        • WT 720 e.tronic
      • Luffing Jib Cranes
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
  • Home
  • all reference projects
  • Police Headquarters Osthessen, Offenbach (DE)

Police Headquarters Osthessen, Offenbach (DE)

Major construction site

Customer
Goldbeck
Crane use
01/2019 till 03/2020
Four WT 650 e.tronic trolley cranes against a blue sky
Aerial view of the Offenbach police headquarters major construction site with 5 WT 650 e.tronic
Five WT 650 e.tronic at the major construction site police headquarters Offenbach
New police headquarters
In Offenbach, a new era in the history of the headquarters is dawning with this new complex. It unites eleven departments in one building and additionally provides room for the new police officers that are going to be trained over the next years. All in all, 900 officers will then be based in this building. 
The construction costs of 162 million Euros are borne by Goldbeck Public Partner GmbH, a private investor from Bielefeld.
The task
Goldbeck constructs the building from system elements, some of which have a considerable weight. In addition, the five cranes must cover a radius of up to 80 m in order to reach all corners of the building complex.
The implementation
Our trolley crane WT 650 e.tronic still lifts 6.3 t at its maximum radius of  82.5 m. Alltogether it manages to lift up to 48 t. This makes it ideal for this major construction site.
More Info
- Press release about the construction of the police headquarters Südosthessen (German only)

5 × WT 650 e.tronic

Kran 1  
Ausladung
80 m
Hakenhöhe 33 m
Basis fahrbar auf UW 410
Kran 2  
Ausladung
67,5 m
Hakenhöhe 46 m
Basis KRT 10-80
Kran 3  
Ausladung
60 m
Hakenhöhe 59 m
Basis KRT 10-80
Kran 4  
Ausladung
60 m
Hakenhöhe 38 m
Basis Fua
Kran 5  
Ausladung
60 m
Hakenhöhe 70 m
Basis KRE 410
WILBERT Project References
  • All
  • all reference projects
  • large construction sites
  • special projects
  • structural engineering
  • bridges and tunnels
  • power plants
WT 260 e.tronic at the replacement of a central bridge in Magdeburg

Replacement Bridge Strombrückenzug, Magdeburg (DE)

Our allrounder crane WT 260 e.tronic works at the central pylon of the bridge that is going to cross the Zollelbe and the Alte Elbe in Magdeburg. With its fast work speeds it is ensuring that everything works smoothly on the builiding site.

Expansion of Utrecht University

On the grounds of Utrecht University, two WT 335L e.tronic and a WT 555L e.tronic are working on an 18 storey building specially designed to be low vibration.

Specialised Crane at Grand Tower, Frankfurt

At Grand Tower in Frankfurt, the facade and the balconies/loggias are attached currently. This task was taken on by a WILBERT specialised crane mounted on the roof of the building.

JaBee Tower, Dübendorf (CH)

The highest residential tower in Switzerland is being built in Dübendorf near Zurich. Five commercial premises on the ground floor and 218 rental apartments are distributed over a tower height of 100 m. Due to the proximity to the airport, the crane was dismantled at night after the suspension of flight operations.
Picture of our WT 420 e.tronic during the deconstruction of Deutsche Bank IBCF in Frankfurt

Deconstruction of Deutsche Bank IBCF, Frankfurt

On the former Deutsche Bank site, the old buildings had to make room for a building complex of four high-rise towers, the Quartier Four, that is planned to be completed in 2023.
Picture of the lift of a bridge segment

Pont du Lanciau, Rossinière

Reconstruction of the Pont du Lanciau: demanding work due to the cramped, hilly terrain and a tandem lift with a mobile crane.
Picture of the Grand Tower and two 420 e.tronic the construction work thereof you can watch on webcam

Grand Tower, Frankfurt

There's a webcam where you can live view the construction of Germany's tallest residential tower and our two WT 420 e.tronic on site.
Picture of Marienturm with the twin towers of Deutsche Bank in the background

Marienturm, Frankfurt

The construction progress of the Marienturm, a new office tower in Frankfurt's banking district, can be viewed live via webcam. Two WT 335L e.tronic cranes from our rental fleet are involved in this project.

Solar Tower Ouarzazate, Morocco

The steel components of the absorber have a maximum weight of 90 t and were lifted to the top of the 240 m solar tower by our WT 2405L e.tronic.
WILBERT Laufkatzkrane auf der Baustelle des HRW-Campus

Ruhr West University of Applied Sciences, Mülheim

HWR’s new campus was built on an area of approx. 40,000 m² between September 2012 and December 2015. Four WILBERT trolley cranes were used: 3× WT 200 e.tronic and 1× WT 320 e.tronic.

REA Turow, Bogatynia (PL)

Here, the task of the WT 2405L e.tronic was the chimney modernisation in a densely built-up area: The existing filters had to be replaced by new, better performing filters at dizzying heights. The crane was assembled at a low height and then erected by crawling for this purpose.
Zwei WT 200 e.tronic und WT 150 e.tronic an der Wohnanlage Feuerbachtraße

Housing Development Feuerbachstraße, Frankfurt

A residential complex comprising 126 luxury apartments and an underground garage with 220 parking spaces was built in Feuerbachstraße in Frankfurt. Construction was completed in 2015. Four WILBERT cranes were used: 2× WT 150 e.tronics and 2× WT 200 e.tronics.
Mehrere WILBERT Krane an der neuen OpernTurm Baustelle

OpernTurm, Frankfurt

The 170m skyscraper was completed in spring 2016 and comprises an impressive 62,500 m² of usable space on 42 storeys. During the construction phase, two WT 300 e.tronics and one WT 205L e.tronic were used.
Getreidesilo im Hafen von Brake

Grain Storage Silos, Brake

38 honeycomb-shaped silos in total measuring 61 m in length, 22 m in width and 83 m in height were erected in the port of Brake, Germany, by a WT 200 e.tronic and a WT 300 e.tronic using the slip-form method.
Mehrere WILBERT Krane am Alpha Rotex im Frankfurter Gateway Garden

Alpha Rotex in Gateway Gardens, Frankfurt

At 66 m and 16 storeys, Alpha Rotex is the tallest building right at the airport. A WT 300 e.tronic, a WT 200 e.tronic and a WT 180 were involved. A height limit had to be observed due to the building’s proximity to the airport.
  • 1
  • 2


  • Contact

    WILBERT TowerCranes GmbH
    Lohrgraben 2
    55444 Waldlaubersheim
    GERMANY

    +49 (0)6707 6668-0
    info@wilbert.de

    Legal notice | Data privacy

  • Sprache wechseln zu

    • Deutsch
  • Top Topics

    • About WILBERT
    • Contact
    • Products
    • Project references
    • Crane service
    • Planning for crane projects
    • Rent a crane
  • General Terms and Conditions

    • Purchase
    • General Delivery
    • Rental Terms & Conditions