• contact  |  phone: +49 (0)6707 6668-0
  • 24h service hotline: +49 (0)6707 6668-1211
    • Deutsch
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
      • General Rental Terms and Conditions
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic
        • WT 200 e.tronic
        • WT 260 e.tronic
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 360 e.tronic
        • WT 420 e.tronic
        • WT 440 e.tronic
        • WT 650 e.tronic
        • WT 720 e.tronic
      • Luffing Jib Cranes
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
logo logo
  • WILBERT
    • Company
      • Contact
      • Partners
      • Career and Training
      • General Rental Terms and Conditions
    • News
      • Product Announcements
      • Construction Site Webcams
      • Press Releases
      • Press Review
  • Projects
    • Top Projects
      • JaBee Tower, Dübendorf (CH)
      • Deutsche Bank IBCF, Frankfurt
      • Solar Tower Ouarzazate, Morocco
    • Project References
      • Major Construction Sites
      • Structural Engineering
      • Power Plants and Cooling Towers
      • Bridges and Tunnels
      • Special Projects
  • Products
    • Highlights
      • Design
      • Modular System
      • Strenghts
      • Transport
      • Assembly
      • Cab
      • Controller
      • Maintenance
      • Advertising
    • Products
      • Trolley Cranes
        • WT 150 e.tronic
        • WT 180 e.tronic
        • WT 200 e.tronic
        • WT 260 e.tronic
        • WT 300 e.tronic
        • WT 320 e.tronic
        • WT 360 e.tronic
        • WT 420 e.tronic
        • WT 440 e.tronic
        • WT 650 e.tronic
        • WT 720 e.tronic
      • Luffing Jib Cranes
        • WT 405L e.tronic [new]
        • WT 555L e.tronic [new]
        • WT 905L e.tronic
        • WT 1305L e.tronic
        • WT 1905L e.tronic
        • WT 2705L e.tronic [new]
      • System Components
    • Used Parts
  • Rental
  • Planning
  • Service
  • Crane Enquiry
  • Home
  • all reference projects
  • Replacement Bridge Strombrückenzug, Magdeburg (DE)

Replacement of a Central Bridge in Magdeburg (DE)

Major construction site

Customer
Hochtief Infrastructure GmbH Deutschland Nordost
Crane use
01/2021 till 03/2022
WT 260 e.tronic am zentralen Pylon des Strombrückenzugs in Magdeburg

WT 260 e.tronic

Radius
40 m
Hook height 76.8 m
Empty hook speed up to 137 m per minute
The new traffic and bridge concept in Magdeburg
For more than fifty years, the city of Magdeburg has been working on a sustainable, flood-proof concept for traffic and the complex of bridges in the town centre. The next step of the project includes a new pylon bridge over the rivers Zollelbe and Alte Elbe as well as the renovation of another bridge called the Neue Strombrücke.

The construction sites are near several architectural and cultural monuments as well as the habitat conservation area “Elbaue zwischen Saalemündung und Magdeburg”.
Allrounder crane WT 260 e.tronic
Our all-rounder crane WT 260 e.tronic proves its qualities with a 40 meters long boom and a free-standing hook height of 76.80 meters. In addition to the maximum load capacity of 12 tons, the crane ensures with its fast working speeds that everything runs smoothly on the construction site. A 65 kW hoist is part of the standard equipment. The lifting speed, while operating with two ropes and continuously variable acceleration, allows for up to 52 meters per minute with a load of 6 tons on the hook. The empty hook speed is up to 137 meters per minute.

A unique requirement of the crane assembly was the need for exact pre-planning of all truck deliveries, as many regular access roads were closed and diversions and one-way routes were set up due to the extensive construction work.
The next steps
A second WILBERT crane, a WT 150 e.tronic, will support the work on the bridge's pylon starting mid-August 2021. This crane will be erected with a 45 meters radius and a hook height of 27.5 meters.
More Info
Further information on the project can be found at www.magdeburg.de/ErsatzneubauStrombrückenzug (German only).

The progress of construction on the building site of the new pylon bridge can also be observed via a webcam. The second webcam shows the new building over the Zollelbe.

WT 260 e.tronic im linken Hintergrund, während im Vordergrund ein Mobilkran arbeitet.
WILBERT Project References
  • All
  • all reference projects
  • large construction sites
  • special projects
  • structural engineering
  • bridges and tunnels
  • power plants
Vier WT 650 e.tronic Laufkatzkrane vor blauem Himmel

Police Headquarters Osthessen, Offenbach (DE)

A new era is dawning for the police in Osthessen. Five WT 650 e.tronic are needed to span the major construction site of the new headquarters that will house 11 departments and 900 officers.

Expansion of Utrecht University

On the grounds of Utrecht University, two WT 335L e.tronic and a WT 555L e.tronic are working on an 18 storey building specially designed to be low vibration.

Specialised Crane at Grand Tower, Frankfurt

At Grand Tower in Frankfurt, the facade and the balconies/loggias are attached currently. This task was taken on by a WILBERT specialised crane mounted on the roof of the building.

JaBee Tower, Dübendorf (CH)

The highest residential tower in Switzerland is being built in Dübendorf near Zurich. Five commercial premises on the ground floor and 218 rental apartments are distributed over a tower height of 100 m. Due to the proximity to the airport, the crane was dismantled at night after the suspension of flight operations.
Picture of our WT 420 e.tronic during the deconstruction of Deutsche Bank IBCF in Frankfurt

Deconstruction of Deutsche Bank IBCF, Frankfurt

On the former Deutsche Bank site, the old buildings had to make room for a building complex of four high-rise towers, the Quartier Four, that is planned to be completed in 2023.
Picture of the lift of a bridge segment

Pont du Lanciau, Rossinière

Reconstruction of the Pont du Lanciau: demanding work due to the cramped, hilly terrain and a tandem lift with a mobile crane.
Picture of the Grand Tower and two 420 e.tronic the construction work thereof you can watch on webcam

Grand Tower, Frankfurt

There's a webcam where you can live view the construction of Germany's tallest residential tower and our two WT 420 e.tronic on site.
Picture of Marienturm with the twin towers of Deutsche Bank in the background

Marienturm, Frankfurt

The construction progress of the Marienturm, a new office tower in Frankfurt's banking district, can be viewed live via webcam. Two WT 335L e.tronic cranes from our rental fleet are involved in this project.

Solar Tower Ouarzazate, Morocco

The steel components of the absorber have a maximum weight of 90 t and were lifted to the top of the 240 m solar tower by our WT 2405L e.tronic.
WILBERT Laufkatzkrane auf der Baustelle des HRW-Campus

Ruhr West University of Applied Sciences, Mülheim

HWR’s new campus was built on an area of approx. 40,000 m² between September 2012 and December 2015. Four WILBERT trolley cranes were used: 3× WT 200 e.tronic and 1× WT 320 e.tronic.

REA Turow, Bogatynia (PL)

Here, the task of the WT 2405L e.tronic was the chimney modernisation in a densely built-up area: The existing filters had to be replaced by new, better performing filters at dizzying heights. The crane was assembled at a low height and then erected by crawling for this purpose.
Zwei WT 200 e.tronic und WT 150 e.tronic an der Wohnanlage Feuerbachtraße

Housing Development Feuerbachstraße, Frankfurt

A residential complex comprising 126 luxury apartments and an underground garage with 220 parking spaces was built in Feuerbachstraße in Frankfurt. Construction was completed in 2015. Four WILBERT cranes were used: 2× WT 150 e.tronics and 2× WT 200 e.tronics.
Mehrere WILBERT Krane an der neuen OpernTurm Baustelle

OpernTurm, Frankfurt

The 170m skyscraper was completed in spring 2016 and comprises an impressive 62,500 m² of usable space on 42 storeys. During the construction phase, two WT 300 e.tronics and one WT 205L e.tronic were used.
Getreidesilo im Hafen von Brake

Grain Storage Silos, Brake

38 honeycomb-shaped silos in total measuring 61 m in length, 22 m in width and 83 m in height were erected in the port of Brake, Germany, by a WT 200 e.tronic and a WT 300 e.tronic using the slip-form method.
Mehrere WILBERT Krane am Alpha Rotex im Frankfurter Gateway Garden

Alpha Rotex in Gateway Gardens, Frankfurt

At 66 m and 16 storeys, Alpha Rotex is the tallest building right at the airport. A WT 300 e.tronic, a WT 200 e.tronic and a WT 180 were involved. A height limit had to be observed due to the building’s proximity to the airport.
  • 1
  • 2


  • Contact

    WILBERT TowerCranes GmbH
    Lohrgraben 2
    55444 Waldlaubersheim
    GERMANY

    +49 (0)6707 6668-0
    info@wilbert.de

    Legal notice | Data privacy

  • Sprache wechseln zu

    • Deutsch
  • Top Topics

    • About WILBERT
    • Contact
    • Products
    • Project references
    • Crane service
    • Planning for crane projects
    • Rent a crane
  • General Terms and Conditions

    • Purchase
    • General Delivery
    • Rental Terms & Conditions